- at least one from different major
- two of our group members are major in interior design while the other three are from
2. Zero cost
-in this project we try to achieve zero cost by using some methods
things like newspaper and bamboo.
seniors to complete this assignment.
3. Packaged– size of geodesic dome (2V)
4. Prefabricated
5. Accommodate 5 people in group
-this dome can easily fit 5 average-sized people
6. Carry able by 3 people
7. Team members only
- only the team members of this group are involved in the completion of this task.
8. Assembled in 30 minute
- we have to construct this dome in 30 minutes between 11.30am to 12.00 noon.
9. SHOW TEAM IDENTITY
10. Assembly : 10 September 2008
: 11.30 am-12.00 noon
11. Lifespan – our assumption on the lifespan of this dome is about one month.
12. Materials must be recyclable
-almost all the materials that we used to construct this dome
and ropes.
LEADER
Mohamad Ridzwan bin Zulkfli 99746
Interior Design
MEMBERS
Muhamad Faris bin Zulkifli 99760
Urban & Regional Planning
Mohamad Fadhlullah bin Ahmad 99745
Interior Design
Ayu Farhana binti Ariffin 99686
Urban & Regional Planning
Nur Nazifah binti Mat Ripin 99796
Urban & Regional Planning
PRODUCT
Geodesic dome-2v
the site that we got is just around the school of hbp.....
it had been chosen by our own lecturer, Dr Wan...
our site : No.13...
Some of the photosduring the domes day

venue : outside E48B
each of the team members
give full of their attention
so that there will be no mistake happened
to the small part



2.Orang yang berperanan dalam sesuatu kejadian, pelaku


























